Saturday, December 17, 2011

Shortening the "to do" list

We arrived back at St Symphorien sur Saone around 1.00pm Sunday 28th August.

Some things had changed and some things were still the same. Boats had come and gone throughout the season and now the regulars were were coming home to roost. Over the next few weeks we saw the comings and goings of many vessels and people we have met as we had wandered the canals. Most of them were heading at this time for their winter moorings, to be closed up and “winterised” against the forces of nature in the French winter.

The canals in the southern areas of France are primarily tourist canals and they close during the winter months. Commercial barges can still use them by arrangement with the authorities – the VNF, who may supply a lock keeper to accompany the barge on it's journey. It is interesting these days that even with the popularity of the canals the VNF's primary source of income from them is the supply of water to industry, as cooling or manufacture, to farmers as irrigation and to the numerous electric power stations we have seen. Even older canals no longer navigable, are used as water courses.

We had a list of things to do with Matilda that seemed to grow every time we checked. The main things were some work on the engine, replace the canvas covers around the stern verandah, rebuild the chimney for the wood fire, set up the insulation on the coach house roof and paint the cabin deck.






We also did some touristy things as well and one day with friends Alan and Ann, we drove in their car to Nuits-St Georges to visit the Cassisium, a cassis distillery. Cassis (or black currants) have been grown and distilled in this area for at least a thousand years. This factory takes as much of the crop they can get and makes a beautiful range of liquers with them. Everyone knows Crème de Cassis.








We visited at the same time as a bus load of Dutch hospitality students and were plied with all manner of samples at the end of our tour. Hard to take!




The mists and dew in the mornings reminded us that the seasons were moving on and we set ourselves a deadline of departure for Nancy before the 14th of October. Our major projects were complete but we did not finish our painting. The deck looks a bit like a spotted animal where we have patched blemishes in preparation for a good final coat. It will have to now wait till the spring.

Thursday 13th October, departure planned for 10.30. We notified the lock keeper the day before of our plans as we were entering the Saone river and they like to know. At 11.20 he finally left his cottage and set the lock for us – French!

Never mind – Nancy, here we come. More next time and till then,


We'll keep in touch

No comments:

Post a Comment